Location |
Projects |
Clients/Architects/Specialists/Consultants |
Ministry of Information, Kuala Lumpur |
Kerja Pengubahsuaian untuk Pusat Berirta Baru dan cadangan membina Retaining Wall untuk kawasan AHU |
JKR ,Kementerian Penerangan |
Kompleks Sukan Negara, Bukit Jalil, Kuala Lumpur |
Acoustic Treatment Works and Rain noise treatment works to metal deck roof: Gymnasium, Biomec Hall 1 and 2, Training Hall 122, 124 and 127, Administration Block Seminar Rooms. |
Perunding HTA SB, Road Builder (M) Sdn Bhd |
RTM Angkasapuri, Kuala Lumpur |
Broadcasting studios for 99.3 FM |
Perunding HTA SB, Time Highway Radio |
Sabak Bernam, Selangor |
Acoustic Treatment and Rain Noise Treatment Works to Dewan Besar (Main Hall). |
Perunding HTA SB, Majlis Perbandaran Sabak Bernam |
Menara PGRM, Cheras, Kuala Lumpur |
Rain Noise Treatment Works to Metal Deck Roof for Auditorium |
Sound Scene Acoustics, Westbury Tubular Sdn Bhd, Gerakreka Architect, Cempaka Sdn Bhd |
Menara PGRAM, Cheras, Kuala Lumpur |
Passive Fire Protection works for structural steel at carpark |
TSSC, Pembinaan Setia Bhd, Cempaka Sdn Bhd |
Perangsang Golf Club, Templer Park |
Acoustic Treatment Works and Interior Fit Out of Bowling Alley |
A V Tech , Inter Decor |
Public Bank, Jalan Ampang, Kuala Lumpur |
Acoustic Treatment and Interior Fit Out Works to Mini Theatre, Level 12 |
Quill Design SB, Public Bank Bhd |
Metro television, Shah Alam, Selangor |
Renovation for News Studio and acoustic treatment works |
World Infonexus, Diversify Resources SB |
MAS hanger, Kuala Lumpur International Airport, Sepang |
Floor to floor treatment of Fire stops and smoke barriers |
BMW, Peremba Sdn Bhd |
Kuala Lumpur International Airport Sepang |
Fire Barrier works to Baggage Handling Terminal at Main Terminal Building PTC 1 |
Taisei Consortium, Juruteras Sdn Bhd |
Kuala Lumpur International Airport Sepang |
Expansion Joints, Operable Wall partitions to Administration Block and Contact Pier at Main Terminal Building, PTC 1 |
Uniphoenix Sdn Bhd, Taisei Consortium |
Mandarin Oriental Hotel, Kuala Lumpur |
Acoustic treatment works and Operable Wall at Hotel Ballroom, Function Room 1 and 2 |
Uniphoenix SB, GDP Architects |
University Islam Antarabangsa, Gombak, Selangor |
Acoustic Partitions, Soffit treatment, rain noise treatment, isolated ceilings and internal wall panelling to LETSC and the Human Science Block |
FAA, Marshall Day Bersekutu, Azastera Kobena JV |
Optimal Group, Union Carbide, Kerteh, Terengganu |
Acoustic Partitions works and wall panelling at Administration Block, Training and Simulator Centre, Central Control Building, Central Laboratory, Waste Water Treatment Plant, Warehouse |
ZO Architect, WAC Architect, Road Builder (M) SB |
Putrajaya Convention Centre, Putrajaya |
Cogent acoustic and thermal insulation systems for Membrane roof at Putra Jaya Convention Centre |
Chadwick Technologies SB, IJM Bhd, Hijjas Kasturi |
Putrajaya Convention Centre, Precinct 5 |
2 hr. fire and acoustic insulation system Ceiling membrane |
IJM Construction Sdn Bhd, Hijjas Kasturi |
Sungai Buloh Hospital, Selangor |
Supply and Install Acoustic Wall Panels and Acoustic Ceiling Works to Auditorium |
Sg Buloh Hospital, Ensignia Construction Sdn Bhd |
Water Treatment plant, Dungun, Terengganu |
Acoustic Treatment control to blower rooms |
SHMB, OTV Sdn Bhd |